Refinishing the Master Bedroom Floors

This is what the master bedroom floor looked like back in the middle of September:


On the righthand side of this photo, near the small rectangle for the supplemental HVAC return, and in front of the bathroom door at the right, is where there was a terrible patch of chewed up floor. (I blogged about this, as well as the way that floor is built, back in 2010.) There were also some dark stains, like the one you can see in the upper left off the front corner of the fireplace hearth tile.

The last week of September, Ricky and Nubee Sneed of Clemmons Flooring, LLC, tackled this job and made these floors beautiful again:




The end of the three-week curing period came over the weekend, which means I got to move back into this bedroom at long last. More about that tomorrow.