Friday, February 20, 2015

Final Phase of Floor (re-)Finishing


The last portion of floor refinishing needed here at the Roediger House is the high-traffic area of the first floor hallway, the entryway foyer, and the stairs going from the 1st to the 2nd floor.


With all the other work going on in the house, it hasn't been possible to get this lined up, and when I did, it turned out other workers and contractors were not finished on time and we had some stutters in these steps.


Yesterday, though, Ricky and Nubee Sneed of Clemmons Flooring LLC got underway on it. Thanks to a winter weather cancellation of school in Guilford County, I got to be home instead of working, which gave me one final chance to smell how awesome this 110-year-old wood is when it's being sanded.






Here's one shot of the hallway, looking towards the front door, after Ricky and Nubee had laid down the stain and the base coat of poly:


And poor Cyprus did not really seem to understand why her movements were being restricted by the child gate:


Speaking of winter weather, the high yesterday barely reached 20°F and it was projected that overnight we would dip slightly below zero!


That's some bitter cold, coupled with ridiculous winds and gusts that sliced right through you. So I finally broke down and built a fire to make the kitchen cozy on a Thursday eve: