
And a shot of the crew working in the chill air but still making good progress (this shot is from the south side, as I stood in my parking area):

This is looking into the ridge built between the roof over the kitchen area and abutting the second floor bathrooms, a necessary feature to properly channel rainwater on the roof:

And finally a fun shot up through the temporary ceiling beams over the second floor bathrooms area, capturing a very pretty blue sky:

No comments:
Post a Comment