Monday, March 30, 2009

Place in Proper Receptacles

Jason Lanier and his crew were here this afternoon working on electrical, and they got a lot of the outlet receptacles and light switches installed in the downstairs areas, as well as the recessed cans in the ceilings of the kitchen area. We talked a bit about hooking up the double oven and the cooktop and the island downdraft vent, all of which needs to wait until I get the 3rd of those items delivered.

Funny how some light switches give things that much more of a finished look. And they don't even work yet.




Robert and Kevin worked on tile today, getting the floor tile put down in the southwest bathroom and putting up much of the wall tile in the main second floor shower. I think Pete and I have got it worked out how we'll handle the soap and shampoo placement in these showers...I ordered some high density resin-based inserts that they'll cut into the backing board and seal around. That'll make me much happier than protruding soap dishes that won't match the tile anyway.

1 comment:

JohnL said...

That's a lot of can lights, man. Of course, with the compact florescent bulbs, one needs more lights.

Gotta have those recessed soap dishes, I agree.